CMF / CRF Details
Convert a conventional signalized intersection to a signalized superstreet
Countermeasure ID: 9985
Description: Convert a conventional signalized intersection to a signalized superstreet (also known as a restricted crossing U-turn intersection or a J-turn intersection)
Prior Condition: Conventional Signalized Intersection
Category: Intersection geometry
Study: Safety Evaluation of Signalized Restricted Crossing U-Turn Intersections, Hummer & Rao, 2017
| Star Quality Rating: |  [View score details] | 
| Rating Points Total: | 90 | 
| Crash Modification Factor (CMF) | |
|---|---|
| Value: | 0.78 | 
| Adjusted Standard Error: | |
| Unadjusted Standard Error: | 0.2 | 
| Crash Reduction Factor (CRF) | |
|---|---|
| Value: | 22 (This value indicates a decrease in crashes) | 
| Adjusted Standard Error: | |
| Unadjusted Standard Error: | 20 | 
| Applicability | |
|---|---|
| Crash Type: | All | 
| Crash Severity: | K (fatal),A (serious injury),B (minor injury),C (possible injury) | 
| Roadway Types: | Principal Arterial Other | 
| Street Type: | |
| Minimum Number of Lanes: | 4 | 
| Maximum Number of Lanes: | 6 | 
| Number of Lanes Direction: | |
| Number of Lanes Comment: | |
| Crash Weather: | Not specified | 
| Road Division Type: | Divided by Median | 
| Minimum Speed Limit: | 40 | 
| Maximum Speed Limit: | 65 | 
| Speed Unit: | mph | 
| Speed Limit Comment: | |
| Area Type: | Suburban | 
| Traffic Volume: | |
| Average Traffic Volume: | |
| Time of Day: | All | 
| If countermeasure is intersection-based | |
| Intersection Type: | Roadway/roadway (not interchange related) | 
| Intersection Geometry: | 3-leg,4-leg | 
| Traffic Control: | Signalized | 
| Major Road Traffic Volume: | |
| Minor Road Traffic Volume: | |
| Average Major Road Volume : | |
| Average Minor Road Volume : | |
| Development Details | |
|---|---|
| Date Range of Data Used: | 2002 to 2014 | 
| Municipality: | |
| State: | AL,NC,OH,TX | 
| Country: | United States | 
| Type of Methodology Used: | Before/after using comparison group | 
| Sample Size (crashes): | 413 crashes before, 315 crashes after | 
| Sample Size (sites): | 11 sites before, 11 sites after | 
| Sample Size (site-years): | 39 site-years before, 26 site-years after | 
| Other Details | |
|---|---|
| Included in Highway Safety Manual? | No | 
| Date Added to Clearinghouse: | Jul 26, 2019 | 
| Comments: | |

